top of page

ELECTRONIC ARTS

BURNABY

The focal point of this phase-two campus building is a five-storey-high central spiral staircase between the two vertical circulation towers. The project provides an addition of 175,000 square feet of high-performance workspaces to the existing campus. The interior main linear atrium connects departments and amenities with the central area defined by two concrete towers. The central spiral staircase serves as a vertical circulation system and a community foyer space. This also echoes the central hub concept of the phase-one development of the campus. Besides major studio spaces, other interior features include a 175-seat theatre, a conference centre, a fitness centre and an NBA regulation-sized basketball court.

CLIENT: ELECTRONIC ARTS / AREA: 170,000 SQ FT / STATUS: COMPLETED / ARCHITECT OF RECORD: MCMP / AWARDS: INNOVATIVE STEEL STRUCTURE AWARD OF EXCELLENCE & DESIGN AWARD WINNER OF SHAW CONTRACT GROUP  

2383749081586787821-512%20copy%202_edite
Copyright © 2026 Tak Chan Architecture Inc. ALL RIGHTS RESERVED.
All content copyrights are reserved by Tak Chan Architecture Inc.
except otherwise stated.
bottom of page